Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
KC-135 Hanger, Tinker Air Force Base
February 5, 2009
6:49 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

This project is for construction of a fully enclosed scheduled maintenance hangar (approximately 28,200 sf) for the kc135 aircraft for the afr and ang associated units at tinker afb. The facility has been designed for isochronal maintenance and does not include painting or fuel cell maintenance. The site is located south of the main diagonal runway at tinker afb near two existing hangars, b1030 amd b1082. This project includes the demolition of three existing buildings, b1037, b1041, and b1045, within the footprint of the new facility. These three buildings total 12,072 sf. The hangar includes administration area with a ready room, offices, and building services such as hydraulics and wheel shops. Construction of an additional parking lot for privately owned vehicles is also included in this project.

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
109 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar