Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
IN - Union City: Demolition of the four (4) City Buildings on three (3) different properties.four (4) multi-level buildings approximately 6,600, 5,020, 1,300 and 20,980 sq. ft.
February 27, 2022
9:16 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Union City: Demolition of the four (4) City Buildings on three (3) different properties.four (4) multi-level buildings approximately 6,600, 5,020, 1,300 and 20,980 sq. ft. The Project will be constructed in two (2) contract divisions which are defined and outlined as follows: Division A – Demolition The Contract Division A will consist of the demolition of four (4) buildings and site restoration. Division B – Construction - Wall Stabilization/Construction, Retaining Wall Construction The Contract Division B will consist of wall stabilization/construction, retaining wall construction and limited concrete work. The Project will be conducted in Four (4) Stages, defined and outlined as follows: Stage 1 Pre-Demolition Work will include all notifications, insurance, and project documentation. The scope also includes removing any PCB Ballast light fixtures, any mercury thermostats, removing and disposing of limited miscellaneous chemicals. Stage 2 Build Replacement Walls – Concrete Work Conduct wall stabilization/construction for the shared north-south wall of the adjoining building. The stabilization/construction of the wall includes, but not limited to, bracing, structural improvements, removal of a portion of the parapet, capping with metal coping, surfacing of the wall with EIFS and roof tie-ins per the engineer’s specifications. Construction of a retaining wall inside the footprint of the building and beyond. The retaining wall includes, but not limited to, construction of a footer, installation additional bracing per the engineer’s specifications. Concrete work includes pouring three (3) sidewalk sections as part of site restoration. Two (2) sections are approximately 12 sq. ft. each and one (1) section is approximately 18 sq. ft. Stage 3 Demolition, off-site Disposal of Debris Demolition of the four (4) multi-level buildings (approximately 6,600, 5,020, 1,300 and 20,980 sq. ft.) will include demolishing the buildings, loading and hauling for recycling/disposal at an approved disposal and/or re-use facility. The buildings slabs and basement walls will be removed to at least 3-feet below grade.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
57 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar