Miami County: Abatement, demolition, and site restoration of the Former Control Tower and Building 14 at Grissom Air Reserve Base, near Peru, Indiana. The Project will be conducted in Three (3) Stages, defined and outlined as follows: Stage 1 Pre-Demolition Work will include all notifications, insurance, and project documentation. The scope also includes removing any PCB Ballast light fixtures, any mercury thermostats, removing and disposing of limited miscellaneous chemicals and an asbestos abatement. An asbestos inspection of the building identified friable asbestos or ACBM which could become friable during demolition. The scope of work includes removal of the asbestos according to State and Federal laws and industry standard practices. Abatement of approximately 825 square feet of cement board; 900 square feet of friable floor tile; 22 linear feet of TSI; 300 linear feet of window caulk/glazings and other ACM. Stage 2 Demolition, off-site Disposal of Debris Demolition of the Former Control Tower and Building 14 (approximately 17,180 sq. ft.) will include demolishing the building, loading and hauling for recycling/disposal at an approved disposal and/or re-use facility. The buildings slabs and basement walls will be removed to at least 3-feet below grade. Any basement slabs below 3-feet will be punctured. Work will include notifications, insurance, site preparation, protection of utilities, and compliance with bid specifications. Stage3
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
128 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950