Marshall: Water System Improvements. The Base Bid Lump Sum Work includes: The construction of one (1) 100,000-gallon Multi-Legged Elevated Water Storage Tank and appurtenances including tank design, excavation, foundation, fabrication, erection, protective coatings, disinfection, placing the tank in service, site piping and appurtenances, tank mixing system, pressure transducer, relocation of existing control and telemetry equipment, electrical, fence, site restoration, erosion control, and other related work. The work also includes the demolition of one (1) 50,000-gallon multi-legged elevated water storage tank excluding foundation and demolition of the existing masonry wellhouse. The Add Alternate Bid Unit Price Work includes:Installing seven (7) new valves in the existing water distribution system.Replacing three (3) existing hydrants with new hydrant assemblies.All excavation, bedding and backfill, surface restoration, erosion control, maintenance of traffic and other incidental work necessary for a complete installation of the Add Alternate
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
54 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090