Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
IN - Marion, demolition of 9 buildings
August 14, 2011
8:00 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Demolition of Nine Buildings - Project 610-301 - Construction project 610-301 "Demolition of Nine Buildings" at the Marion VA campus, 1700 East 38th Street, Marion, IN, 46953. The Contractor shall provide all tools, equipment, material, permits, labor and supervision necessary to accomplish, the work as included on the plans and specifications to include: Asbestos Abatement: all asbestos in the buildings as specified in the reports, is to be abated prior to the commencement of the actual demolition. Existing Utilities: all existing utilities that presently serve the existing buildings are to be; isolated, disconnected, rerouted, capped or removed (and less frequently abandoned) prior to the commencement of the actual demolition as shown on the drawings. Some miscellaneous items are to be relocated and reenergized and some new lines to be ran. Utilities include but are not limited to: Steam and Steam Condensate, Sanitary and Storm Sewers. Natural Gas, Water and Fire suppression, Telephone & Electric. (A two story elevator is to also be removed). Removal of Existing Wood Windows and Doors and relocating of miscellaneous items: all existing wood windows and doors are to be carefully removed without damage, and diverted from landfill or destruction prior to the commencement of the actual demolition. Demolition of Buildings: after the completion and approval by the VA that the first three items above have been completed, then the actual demolition of the building will be allowed to start. The demolition will necessarily have to be conducted with consideration for the adjacent community homes, the VA-Medical Center and the VA- National Cemetery. The magnitude of this construction project is between $2,000,000 and $5,000,000. Bids due 08/25

Find complete details to this bid and more nationwide at envirobidnet.com click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
114 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar