Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
IN - Hammond: multiple demolitions and site restorations
August 11, 2013
6:18 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Hammond: Demolition of existing structures; The description of the demolition work is as follows: Address: 5506 Alice, 1426 Amy, 5535 Beall, 5612 Beall, 5653 Claude, 4908 Columbia, 823 Drackert, 1004 Kenwood, 4 Locust, 7419 Madison, 918 Michigan, 1724 Michigan, 855 Sibley, 1169 Sibley, 5661 Sohl - Rear House only, 5415 Tell, 845 Truman, 5659 Walter, 4404 Towle, 4504 Towle Demolition of existing structure, including foundations, garages, outbuildings (unless specifically excluded) dead trees, and removal and disposal of all debris shall be done in compliance with all applicable Federal and State Laws as well as Building Code of the City of Hammond, all basement floor areas shall be removed, all sewers shall be plugged at the first hub inside the property line, and all water lines shall be tied off and capped on the property side of the buffalo box. Said removal of buildings, equipment and material shall be cleared off within (5) days from the date of the issuance of the demolition permit. Filling in of the property shall be done by filling in the excavation with clean sand only and topping the excavation with four (4) inches of black soil and seeding the same with a suitable grass seed or sod. Prior to the commencement of the demolition, a Demolition Sign, obtained from the Hammond Inspection Department shall be posted in an unobstructed and visible location on the property and it shall remain in that location until the entire demolition, fill and seeding is completed. The property to be demolished shall be photographed by the contractor, prior to demolition, on all sides of the structure so as to show the condition of the entire property at the time of demolition. Should access to the interior be possible, interior photographs, depicting fixtures, contents and condition of the interior, shall also be taken by the contractor. Bids due 08/29

Find details to this bid and more you may be missing nationwide at envirobidnet.com (click below) try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
77 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar