Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
IN - Hammond: DEMOLITIONS-718 165th Street /1003 Morris existing structure, including foundations, garages, outbuildings
August 9, 2020
8:55 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Hammond: DEMOLITIONS-718 165th Street /1003 Morris. Demolition of existing structure, including foundations, garages, outbuildings (unless specifically excluded) dead trees, and removal and disposal of all debris shall be done in compliance with all applicable Federal and State Laws as well as Building Code of the City of Hammond, all basement floor areas shall be removed, all sewers shall be plugged at the first hub inside the property line, and all water lines shall be tied off and capped on the property side of the buffalo box. Said removal of buildings, equipment and material shall be cleared off within (5) days from the date of the issuance of the demolition permit. Filling in of the property shall be done by filling in the excavation with clean sand only and topping the excavation with four (4) inches of black soil and seeding the same with a suitable grass seed or sod.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
65 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar