Hammond: DEMOLITIONS-718 165th Street /1003 Morris. Demolition of existing structure, including foundations, garages, outbuildings (unless specifically excluded) dead trees, and removal and disposal of all debris shall be done in compliance with all applicable Federal and State Laws as well as Building Code of the City of Hammond, all basement floor areas shall be removed, all sewers shall be plugged at the first hub inside the property line, and all water lines shall be tied off and capped on the property side of the buffalo box. Said removal of buildings, equipment and material shall be cleared off within (5) days from the date of the issuance of the demolition permit. Filling in of the property shall be done by filling in the excavation with clean sand only and topping the excavation with four (4) inches of black soil and seeding the same with a suitable grass seed or sod.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
65 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950