Hammond: Demolition of existing structures: 14 residential and commercial properties listed below include demolition of both front and garage structures unless noted): Address: 7508 Birch Avenue 5903-07 Calumet Avenue (multi-unit structure) 712 Cherry Street (front only) 531 Florence Street (front and shed) 5125-27 Hohman Avenue (commercial structure) 828 Indiana Street 1158 Indiana Street 1307 Indiana Street 2314 Indianapolis Blvd 2021 Lake Avenue 1630-34 Roberts Avenue 120 Sibley Street (commercial structure) 5235 State Line Avenue 4240 Wabash Avenue (rear structure only 1219 150th St. (front and garageāto be bid separately) Demolition of existing structure, including foundations, garages, outbuildings (unless specifically excluded) dead trees, and removal and disposal of all debris shall be done in compliance with all applicable federal and state laws as well as Building Code and other ordinances of the City of Hammond. Hammond Ordinances may be viewed online at GoHammond.com. All basement floor areas shall be removed, all sewers shall be plugged at the first hub inside the property line, and all water lines shall be tied off and capped on the property side of the buffalo box. Said removal of buildings, equipment and material shall be cleared off within seven (7) days from the date of the issuance of the demolition permit. Filling in of the property shall be done by filling in the excavation with clean sand only and topping the excavation with four (4) inches of black soil and seeding the same with a suitable grass seed or sod.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
143 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950