Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
IN - Goshen: 828 East Lincoln Ave Phase I Demolition
September 4, 2016
5:43 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Goshen: 828 East Lincoln Ave Phase I Demolition. The demolition project at 828 East Lincoln Avenue will include demolition of the two (2) structures on the property including the completion of required asbestos abatement for identified asbestos containing materials within the main building, full foundation removal, removal of all concrete pads on the property, removal of all salvage yard debris, installation of erosion control measures along Rock Run Creek and installation of fencing along the north property line adjacent to Lincoln Avenue once demolition is complete. Contractor will be required to have current OSHA HAZWOPER certification as this property is a brownfield and conditions beneath the building are unknown.
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online: John
86 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar