Edinburgh: Water System Improvements The work shall include: Existing Facilities: Complete demolition of an existing 7,700 sf mixed use building and existing 2,000 sf metal building. Demolition and restoration of an existing water treatment plant including removal and disposal of a package Aeralator; a new exterior wall and door; and removal of process piping and equipment located in the building. New Treatment Plant: Construction of a new iron and manganese removal water treatment plant including a 2,800 sf masonry building with split faced block veneer; concrete detention tank; concrete backwash tank; 2,000 gpm aerator; three 500 gpm horizontal pressure filters; three 500 gpm high service pumps; process and yard piping; valves; backwash pumps; force main; gas chlorination system; chlorine gas scrubber system; fluoride feed system; Oracle feed system; heating, ventilation, and air conditioning system; motor control center and electrical equipment; SCADA system; and site work including asphalt, concrete, crushed stone, fencing, grading, and restoration Groundwater Wells: Renovation of two existing well houses including replacement of two well pump/motors; replacement of electrical and controls equipment; new doors; new windows; new standing seem metal roofs; new HVAC; caulking; painting; coating; site work and restoration Construction of a new pitless groundwater well including process piping; valves; valve vault; and accessories. Existing Elevated Storage Tanks: SCADA upgrades Work shall be constructed under a Lump Sum Contract.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
131 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950