Dana: Construction of the Water System Improvements project. The Project will be constructed in two contract divisions, which are defined and outlined as follows: Division A – New 75,000 Gallon Elevated Tank: Scope of work includes the erection of a new 75,000 gallon multi-column steel elevated storage tank and the demolition of the existing 65,000 gallon multi-column elevated storage tank. Works also includes site piping, perimeter fence, and site restoration. Division B – Water Supply and Treatment System Improvements: Scope of work includes the installation of approximately 1,150 lineal feet of new 6” raw water transmission main from the wells to the treatment plant, replacing (2) well pumps, replacing the site piping at (2) wells, replacing the induced draft aerator, modifying the existing aerator detention tank, installing a drain line from the existing backwash holding tank to the sanitary sewer system, modifying the backwash holding tank, building an addition on the existing treatment building, upgrading electrical service to the treatment plant and wells, installing a generator and replacing the electrical and controls at the treatment plant, abandoning Well #1 and demolishing its building. Work also includes replacing the existing meters for all customers. Lastly, work includes new perimeter fencing around (2) wells, site restoration and all temporary bypass piping and detention
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
126 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950