Teutopolis CUSD #50 : 2020 High School Demolition . The project consists of Base Bid work: Demolition of the existing 929 and 1949 buildings, connecting corridor and Storage room to the existing 1959 Study Hall and site work to extents as shown on the drawings. The existing building is a three story masonry and concrete building having a footprint of 12,400 sq. ft. Project includes removal of concrete sidewalks and capping site utilities.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
37 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950