Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
IL - STAUNTON CUSD #6: Asbestos Abatement and Demolition - FORMER FIRST UNITED BAPTIST CHURCH, 604 N. FRANKLIN
March 2, 2025
8:20 AM
Avatar
Admin
Forum Posts: 7250
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

STAUNTON CUSD #6: Asbestos Abatement and Demolition - FORMER FIRST UNITED BAPTIST CHURCH, 604 N. FRANKLIN STREET STAUNTON, ILLINOIS 62088 The scope of work calls for the abatement of floor tile and mastic via heat method from the AHERA regulated portion of the building. Abatement of cementitious wall and ceiling panels, floor tile and mastic, window caulk, heat shields, and roof flashing will be required for the NESHAPS regulated portion of the building to be demolished. After the abatement the demolition of the West portion of the building, slab, and footing, grading, and seeding.

Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
53 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3056

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20251

Posts: 28485

Administrators: JOHN: 7602, John: 7250

Skip to toolbar