Demolition of Existing Residential Structures - Phase 1. The work shall include the removal and proper disposal of all asbestos containing material (ACM) located on and within the buildings, the demolition of all existing structures located on these sites, the removal and proper disposal of the building debris, the removal and disposal of existing foundations to a minimum depth of three feet (3') below the existing grade, backfilling the excavated foundations and basements with crushed aggregate, termination of Village water service and sanitary sewer connections, pavement restoration and lot restoration by placement of black dirt and seed. The locations of the properties are listed below: Single Family Residential Buildings 162 W. 141st Street 8 E. 137th Place 7 E. 138th Street 208 W. 138th Street 13840 S. LaSalle Street 13812 Edbrooke Avenue 13925 Michigan Avenue. Bids due 05/20
Find details to this bid and hundreds more nationwide at http://www.envirobidnet.com Try a Free 30 Day Trial
Most Users Ever Online: 429
Currently Online:
38 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950