Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
IL - Machesney Park, demoliton of 45 properties
January 23, 2011
5:01 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Demolition of the structures on up to 45 properties, removal of existing slabs, driveways, fences, pools, removal of basement/foundation walls to 1.0' below grade, backfilling foundations, abandonment of water/sewer services and wells, erosion control, and restoration. Phase II Building Demolition-Floodplain Property. This contract shall include the demolition of the structures on up to 45 properties, abandonment of utilities, removal of buildings, building contents, building foundations, slabs, gravel driveways, asphalt driveways, foundation walls to 1.0' below grade, removal of trees as needed for demolition, removal of storage sheds and accessory structures, removal of fences, filling of foundations & excavations, restoration/reseeding of disturbed areas. Bids due 02/23

Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
88 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar