Elmhurst: 2018 West 500,000 Gallon Elevated Water Storage Tank Project (#17-R0557) and the 2019 North Wellhouse Demolition and 500,000 Gallon Elevated Water Storage Tank Painting Project (17-R0334)The work, in general, shall consist of the 2018 repair and painting of the 500,000 gallon elevated water storage tank located at 364 Scott St. and the 2019 demolition of the existing wellhouse located at 383 W. Armitage along with painting of the 500,000 gallon elevated water storage tank also located at 383 W. Armitage, Elmhurst, Illinois 60126.
Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
67 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090