Iowa DNR, FREMONT: WAUBONSIE POOL REMOVAL. This project involves removal of the swimming pool at Waubonsie State Park and any incidental work as required by the D.N.R Field Engineer in Fremont County. IA Remove existing swimming pool, concrete pool deck, fence, lighting, underground piping and other items used for the pool. The underground water supply piping shall be disconnected and capped in the manhole at the NW corner of the pool. All lights and poles shall be removed in there entirety except the one in the NW corner with the electrical panel and it should be cut off above the panel as the panel is to remain. When evertything is removed the earth banks on the east and south side shall be moved to the north and west side to make a 4:1 slope and the remainder of the area shall be shaped to drain. Contractor will be responsible for materials and equipment stored on site. Site Restoration required for all disturbed areas.
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
57 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950