Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
IA - DNR, FREMONT: WAUBONSIE POOL REMOVAL
July 8, 2018
9:34 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Iowa DNR, FREMONT: WAUBONSIE POOL REMOVAL. This project involves removal of the swimming pool at Waubonsie State Park and any incidental work as required by the D.N.R Field Engineer in Fremont County. IA Remove existing swimming pool, concrete pool deck, fence, lighting, underground piping and other items used for the pool. The underground water supply piping shall be disconnected and capped in the manhole at the NW corner of the pool. All lights and poles shall be removed in there entirety except the one in the NW corner with the electrical panel and it should be cut off above the panel as the panel is to remain. When evertything is removed the earth banks on the east and south side shall be moved to the north and west side to make a 4:1 slope and the remainder of the area shall be shaped to drain. Contractor will be responsible for materials and equipment stored on site. Site Restoration required for all disturbed areas.

Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
57 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar