Des Moines: WRF Grit Removal Improvements. The improvement includes infrastructure modifications to the existing grit removal system, including phased demolition of the existing aerated grit removal tanks, modifications to existing buildings No. 12 and No. 14 and construction of new building No. 10. The major modifications in buildings 12 and 14 include removal and replacement of existing grit washing and handling equipment, pipe work and blower installation. The new building 10 work includes installation of a primary influent bypass channel, stacked tray grit removal system, new grit pump room, electrical room and grit conveyance piping, site work, and utility relocation. All areas will include HVAC, plumbing and electrical improvements, including all necessary materials, equipment, labor, miscellaneous associated work, and cleanup; all in accordance with the contract documents, including Plan File Nos. 581-001/174, located at the Wastewater Reclamation Facility, 3000 Vandalia Road, Des Moines, Iowa.Engineer's Construction Estimate. $9,788,551.00
Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
42 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090