Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
Hurricane Katrina-Replace Civil Engineering Complex
March 13, 2006
7:53 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

[font=Verdana]Hurricane Katrina-Replace Civil Engineering Complex at the [/font][font=Verdana]Air[/font][font=Verdana]National[/font][font=Verdana]Guard[/font][font=Verdana]Combat[/font][font=Verdana]Readiness[/font][font=Verdana]Training[/font][font=Verdana]Center[/font][font=Verdana] located in [/font][font=Verdana]Gulfport[/font][font=Verdana], [/font][font=Verdana]Mississippi[/font][font=Verdana]. The project consists of construction of one facility and demolition of six facilities. Facility 1: Construction will be a two-story 9,000 square foot (approximately) Troop Quarters. Construction will consist of a concrete slab on grade with footings, load-bearing steel-reinforced concrete block unit structure, cast-in-place concrete flooring, architectural brick veneer, metal stud with gypsum non-load bearing w alls, and cast-in-place concrete roof slabs. Utilities and support facilities include fire protection, communications, plumbing, heating, ventilation, and air-conditioning system (HVAC), water, electric power, sanitary and storm drainage systems, concrete parking, access roadways, concrete curb-and-gutter, an irrigation system and landscaping. Facilities 2-7: Demolition of six facilities totaling approximately 12,300 square foot. Demolition will include removal of existing concrete slab on grade with foo tings, wood stud (interior) and concrete masonry unit (exterior) walls, wood trusses, and sloped shingled/standing seam metal roofing. . Design and construction shall comply with the specifications and requirements contained in the RFP. The estimated price range is between $5,000,000 and $10,000,000. This procurement is being solicited using the two-phase design build selection procedures authorized by FAR 36.3. The Phase Once solicitation issue date is on/about April 24, 2006 Phase One proposal closing date is on/about May 24, 2006 Phase One, evaluation factors include, but are not limited to the offeror and offeror

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
48 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar