Housing Authority of the City of LaFayette: BUILDING DEMOLITION FOR FOSTER CIRCLE HOUSING, PHASE II. (hazardous material in eleven (11) one-story buildings, followed by demolition of the buildings,) The Work consists of furnishing all labor, materials, tools, equipment, and incidentals necessary for BUILDING DEMOLITATION FOR FOSTER CIRCLE HOUSING, PHASE II, for the Housing Authority of the City of Lafayette, Georgia, (the Housing Authority), as described in the Project Manual and shown on the Drawings, consisting of abatement of asbestos containing materials (ACM), lead paint, and other hazardous material in eleven (11) one-story buildings, followed by demolition of the buildings, foundations, and minor site features, all located on the Housing Authoritys Foster Circle site in LaFayette, Georgia.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
71 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030