Fulton County School System: Demolition of the Meadows Operation Center Bldg. The general scope of work consists of asbestos abatement the removal of and existing building, regrading and grassing the site and planting trees. Contractor shall demolish and dispose of off-site all building materials including all construction above grade, all concrete slabs, all foundation and retaining walls and footings, all piping and conduit. All piping shall be capped where it enters vaults, manholes etc.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
58 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950