Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
GA - COBB COUNTY BOARD OF ED: demolition and removal of existing building structures and site elements
February 9, 2020
9:10 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

COBB COUNTY BOARD OF EDUCATION: This project consists of, but is not limited to, the demolition and removal of existing building structures and site elements as well as selective demolition and renovation within buildings to remain. New construction includes, but is not limited to a new 750-seat performing arts theater adjacent to the existing theater, new three-story classroom and two story, 3000 seat, gymnasium building structure sited in the middle of the existing campus. Site improvements include, but are not limited to roads, parking lots, storm water detention, utilities, landscaping, and resurfacing of a 400-meter trac

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
51 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar