COBB COUNTY BOARD OF EDUCATION: This project consists of, but is not limited to, the demolition and removal of existing building structures and site elements as well as selective demolition and renovation within buildings to remain. New construction includes, but is not limited to a new 750-seat performing arts theater adjacent to the existing theater, new three-story classroom and two story, 3000 seat, gymnasium building structure sited in the middle of the existing campus. Site improvements include, but are not limited to roads, parking lots, storm water detention, utilities, landscaping, and resurfacing of a 400-meter trac
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
51 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950