Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
FL - Springfield Baptist Church (SBC): Asbestos Abatement and Building Demolition one, two-story, approx. 24,500-S
February 13, 2022
9:15 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Springfield Baptist Church (SBC): Asbestos Abatement and Building Demolition. The Work of this contract involves the asbestos abatement and building demolition of one, two-story, approx. 24,500-SF (masonry and wood framed) building on approx. 1.49-acres on an unoccupied site at 3615 E. 3rd Street, Panama City, FL, 32401. The Work of the Project is defined by the Contract Documents and is generally described by:Contractor shall contract with a Florida Licensed Asbestos Mitigation entity who will prepare a Mitigation Plan and properly abate and lawfully dispose the hazardous materials identified in the Asbestos Survey.Contractor to locate, terminate and cap all utilities at the property lines as required by the utility authorities. Demolish, remove, and properly dispose of all above grade and below ground structures improvements, and utilities as shown.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
100 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar