Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
FL - Sarasota: Hospital buildings demolitions
April 13, 2014
11:14 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Sarasota: (RFQ) GENERAL CONTRACTING WORK. The Sarasota County Public Hospital Board of Sarasota, Sarasota Memorial Hospital, Sarasota County, Florida ("the Hospital") is accepting statements of qualifications from General Contracting Firms. The scope of work may include pre-construction phase services such as cost estimating, value engineering, critical path method scheduling, constructability reviews and cost control, in addition to phased construction management services including but not limited to all required demolition of an existing 5-story, 50,000-square-foot building, demolition of an emergency transformer vault, and the relocation of an existing service road, in association with the design of a new inpatient comprehensive rehabilitation facility, along with related outpatient rehabilitation services, to include two options. Option 1 is a 4-story, approximately 85,000-square-foot comprehensive rehabilitation facility where level one is surface parking and patient drop off, level two is outpatient rehabilitation and support space and level three and four are inpatient comprehensive rehabilitation nursing units. Option 1 also includes the relocation of an existing service road and the demolition of an existing transformer vault. New and existing facilities will have to be connected to the main energy plant. Option 2 is a 5-story, approximately 110,000-square-foot comprehensive rehabilitation facility where level one is surface parking and patient drop off, level two is outpatient rehabilitation and support space, level three and four are inpatient comprehensive rehabilitation nursing units, level 5 is enclosed interior, conditioned mechanical space, and the entire building structure is designed with vertical expansion capability to 9 stories. Option 2 also includes the relocation of an existing service road and the demolition of an existing transformer vault. New and existing facilities will have to be connected to the main energy plant. Bids due 05/15

For details to this bid and hundreds more nationwide go to http://www.envirobidnet.com and try a Free 30 Day Trial

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
52 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar