Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
FL - Port of Palm Beach: Maritime Office Building Demolition
May 6, 2018
9:09 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Port of Palm Beach: Maritime Office Building Demolition & Cargo Yard Conversion. Project consists of the asbestos and lead paint abatement and complete demolition of Maritime Office Building (MOB), foundation and portions of foundation piles, adjoining hardscape and landscaped areas, light poles and foundations, removal of existing pavement and installation/replacement with new heavy duty pavement, duct bank installation for relocation of existing overhead electrical and telecommunication lines by an FPL certified electrical contractor, installation/modification of underground utility vaults, potable waterlines and storm water conveyance pipe, installation of electrical transformer and switch-gear and high mast lighting, and site perimeter fencing within a three acre parcel at the Port of Palm Beach, Riviera Beach, Florida.

Contact information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
37 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar