Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
FL - Palm Bay: demolition of 300,000 gallon legged Water Tower
November 18, 2012
6:20 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

MAIN STREET WATER TOWER REMOVAL. The demolition, containment, monitoring and testing, removal and disposal of the 300,000 gallon legged Water Tower, the partial removal and disposal of its concrete foundation and associated piping, navigation light system and other associated wiring and the electrical panel. Containment and disposal of all waste material and fluids, scrap steel as set forth in the Project Specification Document (Attachment

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
41 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar