Ocala: WRF #1 Redevelopment Phase 4. The City of Ocala requires the services of an experienced Contractor to provide demolition services for the WRF #1 Demo Phase 4 and Fairfield/Saddle Oaks Well Abandonment. There are two separate locations and plan sets for this bid. The first project consists of demolishing the City of Ocala's Water Reclamation Facility #1 located at 1220 NW 4th Avenue, Ocala, FL. 34475. The project includes but is not limited to the removal of sulfate tank, digester tanks, pumps, and building, odor control units, trickling filters, and dosing tank in addition to piping and miscellaneous ancillary equipment associated with the structures as shown in the plan set Exhibit B - Plan Set WRF1 PH4. The second project consists of the demolition, removal, and hauling away of the existing water tanks that are shown on the plan set in Exhibit C - Plan Set Fairfield-Saddle Oaks Tanks. These tanks must be removed prior to the initiation of the WRF #1 demolition.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
83 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030