Miami-Dade County: Cruise Terminal J Seawall Repairs. The Cruise Terminal J Seawall Repairs project is comprised of, but not limited to: maintenance of traffic and environmental protection, including construction of temporary fencing, barriers and gates to define the work area; demolition, excavation, removal of existing concrete cap, and excavation of upland area to expose tieback system connection; construction of new concrete cap, encapsulating the existing bulkhead and extending down to - 3.0 feet (Mean Low Tide); backfilling and compacting excavated areas to match existing; installation of double-bitt deck fittings (marine bollards) and foam-filled fender system; extending the potable water and fire protection distribution system, providing fire hydrant and potable water stations, with concrete enclosures; paving apron area, including heavy-duty asphaltic concrete pavement and base; providing pavement markings and signage, and any supportive ancillary tasks to the primary scope of services to successfully complete the project. The approved budget in the Request to Advertise is $9,812,593.62, and the contract duration is 365 calendar days as defined in the contract documents. All work shall be performed as per the Contract Documents.
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
91 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090