Key West: SAILFISH PIER REPLACEMENT, CITY MARINA AT GARRISON BIGHT. The project proposes to demolish the existing concrete and wood Sailfish Pier and replace it with a new floating dock, approximately 210 feet in length, with ten 35ft long finger piers (with up to 17 slips). The proposed facility is located between Palm Avenue Causeway and N. Roosevelt Blvd at Garrison Bight. The floating dock facility will include potable water, fire protection, electrical and sanitary sewer systems, and will be access from the south via a new gangway ramp from the existing adjacent concrete / paver walkway.
Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)
Most Users Ever Online: 429
Currently Online:
40 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090