Daytona Beach: Ballough Road Bridge Replacement, Dredging and Marina Village Public Boat Ramp and Docking Facilities. The primary project elements are identified as: 1. Dredging (from the bridge to the basin and including the basin), 2. A boardwalk around entire perimeter of basin (with boating access/tie-ups), 3. A new boat/kayak launch ramp and retrieval facility on the west side of the basin and 4. Replacing the bridge on Ballough Road with one that is appropriately designed for height and length to accommodate the size of watercraft that will be accessing the boat/kayak facility and the planned Marina Village commercial waterfront development surrounding the Root Pond waterway. Bids due 09/08
Details to this bid & hundreds more nationwide at http://www.envirobidnet.com Free 30 Day Trial – 15% discount for DF members if you subscribe (enter code D0246 when taking a trial to qualify)
Most Users Ever Online: 429
Currently Online:
33 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950