Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
FL - Crystal River: Three Sisters Springs Bank Stabilization Project
January 17, 2016
6:23 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Crystal River: Three Sisters Springs Bank Stabilization Project. The Southwest Florida Water Management District (District) requests bids from responsive and responsible bidders for Services and Materials required for Three Sisters Springs Bank Stabilization Project in Citrus County, Florida. These services and materials are more specifically described in this Request for Bids (RFB). The successful bidder, hereinafter Contractor, will deliver the required services and materials and render the required goods/services F.O.B. destination point at 601 Three Sisters Springs, Crystal River, Citrus County, Florida. The work includes the construction of shoreline stabilization and restoration of eroded banks surrounding the Three Sisters Springs site utilizing filter stone as a leveling substrate, geotextile bags to fill undercut voids, and limestone rip-rap to stabilize and protect the geotextile bags. Other required construction items include project staging and mobilization, erosion control, water quality protection, site clearing & grubbing, wetland planting, existing boardwalk removal and re-installation, temporary construction access, and site restoration including grading and grassing of areas disturbed by the Contractor. The project includes the work requirement for removal of nuisance vegetation. Geotextile bags have been purchased and will be supplied by the District. Limestone boulders have been stockpiled at the project site, but additional materials (limestone boulders, filter stone, and geotextile bag fill material) will be the Contractor’s responsibility to supply.

Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
141 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar