Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
FL - Crescent City: 301 CENTRAL AVE. DEMOLITION PROJECT
August 7, 2016
7:46 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Crescent City: 301 CENTRAL AVE. DEMOLITION PROJECT. Project consists of demolition and removal of related debris of an 8,500 square foot, two story commercial building located on city-owned property at 301 Central Avenue in Crescent City, Florida 32112. Structure is an older brick building dating back to the early 20th Century that was renovated around 1980 with the walls and ceilings reinforced on the inside with steel and insulated on the outside with an Exterior Insulation and Finish System (EFIS). An emergency exit stair made of concrete block and EFIS was also added at this time. Work includes but is not necessarily limited to: Complete demolition of the Building, including removal of foundation.

Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
39 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar