Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
FAA, Administration Wing Mini-Mod Upgrade, Farmington, Minnesota
February 1, 2006
8:57 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

[font=Verdana]Firms interested in subcontracting opportunities for the subject project should contact the following 4 firms: [/font]

[font=Verdana]Jeff Jones[/font]
[font=Verdana]Imperial Construction, Ltd.[/font]
[font=Verdana]Weatherford[/font][font=Verdana], [/font][font=Verdana]TX[/font]
[font=Verdana](817) 341-8886 [/font]

[font=Verdana]Steve Ripsin[/font]
[font=Verdana]Sheehy Construction Co.[/font]
[font=Verdana]St. Paul[/font][font=Verdana], [/font][font=Verdana]MN[/font]
[font=Verdana](651) 488-6691 [/font]

[font=Verdana]Steve Thornberry[/font]
[font=Verdana]Reliable Contracting Group[/font]
[font=Verdana]Louisville[/font][font=Verdana], [/font][font=Verdana]KY[/font]
[font=Verdana](502) 244-2597 [/font]

[font=Verdana]David Esparza [/font]
[font=Verdana]CAL, Inc.[/font]
[font=Verdana]Vacaville[/font][font=Verdana], [/font][font=Verdana]CA[/font]
[font=Verdana](707) 446-7996 [/font]

[font=Verdana]Request for Offer due date is [/font][font=Verdana]February 27, 2006[/font][font=Verdana]. Scope of Work: Includes, but is not limited to the renovation of the basement, first floor and second floor areas and all other work as indicated in the project specifications and on the project drawings as follows: Demolition work includes: removal and legal disposal of friable and non-friable asbestos containing/contaminated materials (including pipe and duct insulation, fittings, floor tile, and other items); removal of lead based paints and PCB ballast; and construction of temporary negative-air-pressure enclosures. Demolition work also includes, but is not limited to: removal of existing walls, doors, carpeting, ceilings, mechanical HVAC handling system (including air handling units, fan coil units, piping, thermostats, diffusers, grilles, sensors, controls, etc.), electrical system (including panel boards, lighting fixtures, wiring, conduits, receptacles, switches, etc.), and the fire alarm system. Construction includes, but is not limited to, the following: construction of new partition walls (with interior sidelights and windows), doors, ceilings, venetian blinds and finishes; installation of new mechanical systems, including HVAC air handling units, fan coil units, piping, thermostats, diffusers, controls, sensors, drinking fountains and plumbing; installation of new fire protection systems, including piping, sprinkler heads, conduits, wiring and smoke detectors; installation of new lighting and power systems, including panel boards, light fixtures, wiring, switches and outlets; installation of new communications systems including Telco cabinets, speakers, data/telephone jacks, wiring, cables and cable tray; installation of LAN Closet, LAN cabling from wall plates to government furnished switch rack, and voice cabling to Telco closet (including termination, testing, and labeling); and other work as required on the project drawings and specifications. Offer range is between $1,000,000 and $5,000,000 with a performance time of approximately 240 calendar days. Construction start is anticipated for spring 2006.[/font]

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
109 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar