Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
Demolition of Junipero Serra State Office Building
June 16, 2006
10:19 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

Nice size project:

[FONT=Verdana]The US General Services Administration is seeking sources to demolish an existing building. The demolition will be in preparation for clearance of a federally owned site to construct a new 1,000,000 square foot 17 story Federal Courthouse to be solicited in a subsequent announcement. The Former State Building is located at 107 West Broadway, between 1st and 2nd Streets and also bordering on Hill Street in Downtown Los Angeles, California. The building occupies a portion of a block and is 523,000 gross square feet and includes an adjacent parking structure. It is a steel frame building of nine stories including basement and access tunnel extending under Broadway. The building has been abated of hazardous material with the exception of transite wall panels left in place to maintain building closure. The solicitation is anticipated to be released as a Design-Build solicitation and a Best Value selection in early July and award of the demolition contract is anticipated for September 2006. The contract will include, but is not limited to: preparation of management and demolition plans including but not limited to detailed procedures for method of accomplishment, staging, removal of materials, recycling and development of shoring plans to protect adjacent streets and structures as required to perform the work; coordination with local agencies; design submittals to GSA for review of compliance with the design guidelines; quality control review of documents; constructability review of the contract documents and drawings; monitoring and documenting quality; developing innovative opportunities to improve the projects design of abatement and demolition procedures; provide project coordination between subcontractors, as well as Quality Assurance and Quality Control functions; monitor cost and schedule, provide cost estimates, reports; and provide all safety function, all necessary permits and environmental requirements. GSA has established a LEEDS goal of Silver for the New Los Angeles Federal Courthouse and the Contractor shall identify and implement any aspect of the abatement and demolition that qualifies for points toward that goal. For further information, contact Ms. Beverly Chin at 415.522.3141 or [email]beverly.chin@gsa.gov[/email].[/FONT]

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
89 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar