Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
CT - Windsor Locks: TOD Responsible Growth Grant Phase 1 – Demolition Chestnut Street
October 4, 2020
8:43 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Windsor Locks: TOD Responsible Growth Grant Phase 1 – Demolition Chestnut Street, Windsor Locks, CT. The work to be performed under this contract includes the demolition and removal of three residential homes with associated foundations, utility disconnects, driveways, sidewalks, accessory garages and sheds at 47, 41 and 39 Chestnut Street in Windsor Locks, Connecticut. The work includes removal of the entire 2-story wood frame structures, porches, garages and other accessory structures; removal of foundations; backfill and compaction of foundation holes; removal of asphalt driveways and concrete walks; disconnection and capping water, sewer, gas utility services at the property line; removal of overhead electric and telephone services; furnishing topsoil and turf establishment. Environmental testing and asbestos abatement plans have been prepared for each property.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
49 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar