HAZARDOUS MATERIAL ABATEMENT & DEMOLITION AT NIKE SITE ON GARDEN GROVE ROAD COMMUNITY BUILDING
Except as otherwise specified, the Contractor shall break up, demolish and remove from site for
disposal/recycling/reuse:
1. All of the building structures
2. All surface debris, brick, stone and concrete
3. All structures, piers, tunnels, below existing grade or below final grade, whichever depth is lower
There will be a mandatory site visit on May 16, 2013 at 10:00 a.m. at the site.
Bids due 05/29
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL