Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
CT - HARTFORD: demolition w/asbestos and hazmat
September 29, 2013
6:46 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

PHASE 1A WEST MIDDLE SCHOOL. BID PACKAGE 1.2A DEMOLITION and ABATEMENT (Main Building, Connector (Annex), and Gym; and Chimney, Coal Bunker, and Utility Connector, formerly BP 1.4) Bid Package #1.2A includes, but is not limited to building demolition, selective interior, structural demolition except for the demolition included in other bid packages and includes, but is not limited to, presumed asbestos-containing materials (PACM), asbestos-containing materials (ACM), Lead Paint, fluorescent lights, PCB ballast, & mercury switch materials, and other hazardous materials not included in any of the other bid package.

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
79 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar