Connecticut Airport Authority: Demolition of Administration Building - Hartford-Brainard Airport. The project consists of: Demolition of the former Administration Building at the Hartford-Brainard Airport followed by site restoration. The two-story commercial building with basement encompasses approximately 2,600 square feet. Prior to structural demolition, Universal Wastes and other listed regulated items and off-site disposal or recycling must be removed from the building, abatement of asbestos containing materials (ACM) and off-site disposal must be performed, and identified paint and caulk containing polychlorinated biphenyl (PCB) must be removed for off-site disposal as PCB Bulk Product Waste. Demolition of the building includes associated sidewalks, foundation, and ramps.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
99 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950