Captain Jack Superfund Site Surface Remedy Estimated Construction Cost: $1,500,000 - $2,000,000. Project Description: The intent of the project is to implement the Surface Remedy at the Captain Jack Superfund Site, located near Ward, Colorado. The remedy generally includes excavation of contaminated materials and consolidation in an onsite repository. Major components of the project include: all project management; excavating, processing and amending borrow material to create growth media; demolition of ancillary onsite structures and disposal of miscellaneous debris; installation of a concrete box culvert adit extension; excavation and consolidation of contaminated materials into a repository; abandonment of monitoring wells, relocation of power pole(s), and replacement of a septic system; restoration of excavated areas; grading and capping of contaminated materials; construction of drainage channels and ponds; and other work as necessary to implement the remedy as described in the drawings and specifications. Bids due 11/28
Find complete details to this bid and more nationwide at envirobidnet.com click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
99 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950