Colorado Department of Transportation: SH 14: COAL BANK CREEK BRIDGE. CONSISTING OF BRIDGE REPLACEMENT, WHICH INCLUDES PRELOADING EMBANKMENT, PHASED STORM SEWER, COFFERDAM AND DRAIN POND, FABRICATION OF BRIDGE ELEMENTS, BRIDGE REMOVAL, BRIDGE RECONSTRUCTION, PAVEMENT REMOVAL, EMBANKMENT FILL, HMA, GUARDRAIL, RIPRAP, CHANNEL RECONSTRUCTION, WEIR CONSTRUCTION, STRIPING AND TRAFFIC CONTROL Bids due 11/29
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
56 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3048
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20151
Posts: 28385
Administrators: JOHN: 7602, John: 7150