Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
CO - Florissant: WWTP demolition
May 5, 2014
7:08 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Construction of a new treatment facility including foundation, building, interior piping, electrical, HVAC, driveway access, installation of a new water storage tank and associated piping, relocation of existing pumping equipment, site grading, installation of approximately 7,700 LF of 4” water main, boring approximately 600 LF of 4” waterline, installation of approximately 2670 LF of ¾” service line, replacement of 49 meters, meter pits and remote readers, installation of 1,100 LF of 2” water line, demolition of existing building and restoration of existing site, soils testing, concrete testing, pressure testing. Bids due 05/29

Find details to this bid and hundreds more nationwide at http://www.envirobidnet.com Try a Free 30 Day Trial

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
70 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar