Yuba County: New York House Road over Dry Creek Bridge Replacement. The work in general consists of replacing the existing bridge with a new concrete bridge, roadwork, railing, and paving. Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or installed. The estimated cost of the project is $1,282,360.
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
148 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090