YUBA CCD: Yuba College, Demolition-Removal of Buildings 1300 and 1500. This project includes the demolition and complete removal of buildings 1300 and 1500. This work is planned to be done during the summer, and early fall of 2021. The Contractor shall grade the area vacated by the buildings and associated sidewalks smooth and level, provide specified compaction to minimize future settling. If the area vacated by the buildings is not level and smooth with the surrounding ground, the Contractor shall provide topsoil to the low areas so that they are at least the same elevation as the surrounding area. It is the intention that the ground surface vacated by the buildings is prepared for future landscaping site improvements.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
120 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950