Demolish all wooden structures including flagstone, cobblestone and masonry architectural components, concrete foundations, concrete driveways and wooden and chain link fences and poles. Cap all utilities. Protect in place the existing trees and landscape as possible. Backfill excavations, place topsoil and restore the areas with hydro-seed or mulch. Establish grass roots. Asbestos and lead paint are gone Bids due 09/07
Find complete details to this bid and more nationwide at envirobidnet.com click on link below - try a FREE 30 DAY TRIAL