University of California, Berkeley: Tolman Hall Demolition. Estimated Construction Cost: $6,000,000. DESCRIPTION OF WORK:a. Interior Demolition Work: The abatement of all hazardous material and removal of all internal nonstructural walls and finishes; ceiling finishes, mechanical devices and light fixtures; floor finishes,remaining furniture and cabinetry to the structural slabs. All efforts are to be made to recycle these components.b. Scope of Building Demolition Work: The entire removal of the existing building and landscape features (retention walls, paving and plantings) as indicated upon the construction documents. This includes to installation of traffic control measures, site and landscape protection and storm water measures. All efforts are to be made to recycle all building materials.c. Scope of Site Restoration Work: The filling and grading of the site, the replacement and repair of adjacent roadways, walkways and landscaping per the construction documents
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
52 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090