SAN FRANCISCO UNIFIED SCHOOL DISTRICT: Tule Elk Park Early Education School Demolition and Abatement Project. The Project is generally described as:Two-Story Annex Building and One-Story Cafeteria Building (Administration Building):Install Temporary Fire Alarm System. Abatement and demolition work in all areas of the building interiors as shown on the Drawings including finishes, building systems and infrastructure, fixtures and fittings, non-structural framing, furnishings and equipment. The integrity of the building envelope(s) as pertains to weather protection or intrusion / security from the existing conditions shall not be compromised.One-Story Classroom Building / Bungalows: Completely remove all portions of the existing bungalow building, safe-off and cap utilities serving the building, remove paving and curbs as needed for removal of the building.Limited Site Demolition: as indicated on the Drawings. Do not remove perimeter fencing securing the property interior or otherwise compromise the integrity of the perimeter security fencing. Do not execute any work in the public right of way unless expressly indicated on drawings. The Estimated construction value of the work is $1,300,000.
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
79 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950