Shasta Lake: Toyon Water Plant Complete Demolition. Work on this project includes, but is not limited to, repair of plant access road, complete legal demolition and recycling and/or legal disposal of all above-ground plant components including existing site structures and enclosures, buildings, tanks, pipelines, valves, vaults and vault lids extending above ground, electrical and mechanical equipment, and all other materials and debris comprising the physical components of the Toyon Water Treatment Plant, backfill of all vaults, cavities, and voids to ground level with 3”-minus fill material, miscellaneous debris removal, gate removal, and site cleanup. All other items or details not mentioned above that are required by the Plans or the Contract Documents shall be furnished, fabricated, constructed, or installed. The Engineer’s Estimate for this work is $250,000
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
117 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950