West Contra Costa Unified School District: Dover Elementary School MPR Demolition and Site Improvements Phase 1. PRELIMINARY ESTIMATE: $360,000 The Project consists of: Removal of hazardous material and lead-based paint, demolition of the existing multi-purpose building, demolition of site utilities including domestic water and fire lines/meters, sanitary sewer and storm drain lines, demolition of existing power and low voltage systems including intrusion, data and fire alarm. Work also includes coordinating with PG&E for removal of utility services, providing erosion control measures and grading the site. A MANDATORY pre-bid conference and site visit will be held on June 27, 2013, at 9:00 a.m. at Dover Elementary School, Multipurpose Room, 1871 21st St., San Pablo, California 94806. All participants are required to sign in and sign out. Failure to attend or tardiness will render bid ineligible Bids due 07/11
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - sign up for a FREE 30 DAY TRIAL to see more jobs you may be missing
Most Users Ever Online: 429
Currently Online:
100 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950