Peninsula Corridor Joint Powers Board: San Francisco Roadway Bridges Replacement Project. This public works project will remove/replace existing two-span steel-through girder bridges (22nd Street, 23rd Street, and Paul Avenue) due to deteriorated condition; and remove/relocate/reconstruct existing utility lines; provide temporary support as applicable at each Bids due 09/29