San Diego Unified Port District: DEMOLITION AND SITE IMPROVEMENTS OF TRANSIT SHED 1 AT TENTH AVENUE MARINE TERMINAL 2017-03. Work to be done shall be according to Drawing 2017-03 and Specification No. 2017-03 of the San Diego Unified Port District and shall include: Hazardous Materials Abatement (Primarily Asbestos and Lead Based Paint), Structural Deconstruction; Demolition and Removal of Transit Shed 1, Bays A, B & C, adjacent Metal Shed, and Loading Dock; Recycling or legal disposal of all demolished materials; Crushing of Building Concrete Walls and Foundation to be used as Base Material; Excavation Unclassified Soil Material and placing and grading Soil Material at District Facility in Chula Vista; Water, sewer, and Electrical abandonment; Electrical Utility Service Upgrades, including 90 foot Mast Lighting, Fire Protection System, Storm Water Conveyance and quality BMP Improvements, and Site Paving; CCTV Camera Installation , Prefabricated Modular Restroom/Office Building and all other incidental items of Work as shown and specified. Work also includes installation of Modular Office Facility Site Improvements by the Main Gate including Site Grading, Retaining Walls, Water, Sewer, Electrical Services, Storm Water Conveyance and Quality BMP Improvements, and all other incidental items of Work as shown and specified
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – try a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
125 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090